![]() ![]() Our HVAC engineers had to pick a special type of fan blades used for the HVAC cooling system to minimize the sound output from the fans in a 100% mode. This optimized the effort of changing filters on a constant basis, reducing the amount of labor hours needed to perform the work. The company’s team developed a simple from an operational perspective but complex from an engineering perspective filter louver door in each section. ![]() The design of the mobile data center was divided into 6 separate sections, each having its own autonomous electrical surge protection infrastructure to operate each section independently. Our engineering team had to design a separate electrical room built from scratch to make the work of the electrical operations team simpler and safer. EZ Blockchain redesigned the mobile data center with a unique shelving system and airflow system to bring its capacity up to 2.5 MWs, installing 720 x Bitmain S17 type miners. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |